Production

Egypt: Eni to add 80Mmcfpd of gas from the Nooros field by the end of November

Wednesday, 26 October 2016 14:59

In Egypt, Eni plans to add 80Mmcfpd of gas from its Nooros concession to the national grid by the end of November 2016.

According to a source with the Egyptian Natural Gas Holding Company (EGAS), the total gas production from Nooros is set to increase from 850Mmcfpd to 930Mmcfpd by the end of November. This is to occur after the drilling of a number of development wells and adding them to the project’s production, Egypt Oil &Gas reports.

Connecting these wells to the national gas grid will help fill the natural decrease gap in local gas production, which is estimated at 600Mmcf each year with an average of around 50Mmcf per month.

The Nooros field is located in the Abu Madi West concession in the Nile Delta, about 120km northeast of Alexandria. The field was discovered in July 2015, and put into production two months later in September. The development and production of the Nooros field are operated by Petrobel on behalf of Nidoco Co., a joint venture between IEOC, BP and the state company Egyptian General Petroleum Corp. (EGPC).

Eni is the operator through its subsidiary IEOC Production BV, which holds a 75% stake in the concession, while BP holds the remaining 25%.

Anita Fatunji

Ecofin Agency provides daily coverage of nine key African economic sectors: public management, finance, telecoms, agribusiness, mining, energy, transport, communication, and education.
It also designs and manages specialized media, both online and print, for African institutions and publishers.

SALES & ADVERTISING

Benjamin FLAUX
bf@agenceecofin.com 
Téls: +41 22 301 96 11 
Mob: +41 78 699 13 72
Média kit : Download

EDITORIAL
redaction@agenceecofin.com

More information
Team
Publisher

ECOFIN AGENCY

Mediamania Sarl
Rue du Léman, 6
1201 Geneva
Switzerland

 

Ecofin Agency is a sector-focused economic news agency, founded in December 2010. Its web platform was launched in June 2011. ©Mediamania.

 
 

Please publish modules in offcanvas position.